APPLICATION & REFERENCES
References
4x12000kW WHRU CNOOC LW3-1 | 3x8000kW Fired boiler CPECC Oversea Project | ||||
4x12000kW (3x41 MBtu/h) (Gas fired) CNOOC Indonesia Sumatra Gas Field | 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired) CNOOC QHD326 FPSO | ||||
12000kW (41 MBtu/h) (Heavy Oil fired) Shanghai Petro-chemical, Polyester Production | 2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired) SINOPEC Yanshan Petro-chemical | ||||
2x6100kW (2x21 MBtu/h) (Gas fired) CNPC (International) Sudan Fula Oil Field | 3x5000kW (3x17 MBtu/h) (WHRU) CNOOC LVDA Oil & Gas Field (Offshore) | ||||
2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired) PDOC Sudan Block3-7 | 2x6700kW (2x23 MBtu/h) (Gas fired) | ||||
3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired) CNOOC Nanbao Offshore Oil Field | 3x6000kW (3x20 MBtu/h) (WHRU) CNOOC BZ28-2 Oil & Gas Field (Offshore) |